Local service in RH14

Local Electrical Contractor

  • 10(302 reviews)

We are offering following services Installation Services Electrical Maintenance, Emergency Electrical Repairs, Electrical Upgrades, Safety Inspections and Testing, Security System Installations, Data and Communication Wiring, Renewable Energy Installations, Fire Alarm Systems, Commercial and Industrial Services, Home Automation Systems, Electrical Design and Consultation, Energy Efficiency Audits, Exterior Lighting Installations, Generator Installation and Maintenance, Fault Diagnosis and Repair, Lightning Protection Systems, HVAC Electrical Integration, Underfloor Heating Systems, Electric Vehicle Charging Station Installation,

RH14

UK

How Long Does It Take to Rewire a House?

The time required to rewire a house can vary depending on several factors such as the size of the property, the complexity of the electrical system, accessibility, and whether the house is occupied during the rewiring. Here’s a detailed overview of how these factors influence the rewiring timeline and what you can generally expect:

Factors Influencing the Duration

  1. Size of the House
    • Small Homes (1-2 Bedrooms): Generally takes less time due to fewer circuits and electrical components.
    • Medium Homes (3-4 Bedrooms): Requires more time due to additional rooms, circuits, and electrical fixtures.
    • Large Homes (5+ Bedrooms): Takes the longest due to the extensive amount of wiring, circuits, and fixtures involved.
  2. Scope of Work
    • Full Rewire: Involves replacing all electrical wiring, sockets, switches, and possibly upgrading the consumer unit (fuse box). This is more time-consuming than partial rewiring.
    • Partial Rewire: Focuses on specific areas of the house, such as the kitchen or a single floor, and takes less time compared to a full rewire.
  3. Complexity of the Installation
    • Age and Layout of the House: Older homes with existing wiring that is difficult to access (e.g., behind plaster walls) take longer to rewire. Modern homes with accessible wiring are quicker to work on.
    • Number of Circuits and Fixtures: The more circuits, outlets, light fittings, and electrical features included, the longer the rewiring process.
  4. Occupancy Status
    • Occupied Homes: Rewiring an occupied home requires careful planning and coordination to ensure the safety and convenience of occupants, which can extend the timeline.
    • Vacant Homes: Rewiring a vacant property is generally faster as electricians can work without interruptions and don’t need to accommodate residents.
  5. Accessibility and Preparation
    • Accessibility: Easy accessibility to the wiring routes, such as loft spaces, underfloor voids, and cavity walls, can speed up the process.
    • Preparation and Clearances: Preparing the space by moving furniture and clearing work areas beforehand can facilitate a smoother and quicker rewiring process.

Typical Duration

  1. Small Homes (1-2 Bedrooms)
    • Estimated Time: Typically 3 to 5 days.
    • Scope: Involves replacing basic circuits, sockets, switches, and possibly upgrading the consumer unit.
  2. Medium Homes (3-4 Bedrooms)
    • Estimated Time: Usually 5 to 10 days.
    • Scope: Covers more extensive wiring, additional circuits, more sockets and switches, and a comprehensive upgrade to the consumer unit.
  3. Large Homes (5+ Bedrooms)
    • Estimated Time: Generally 10 to 20 days or more.
    • Scope: Involves extensive rewiring, numerous circuits, a large number of sockets and switches, sophisticated lighting systems, and possibly a new consumer unit.

Steps in the Rewiring Process

  1. Initial Assessment
    • Survey and Planning: The electrician will conduct a thorough survey to assess the existing wiring, determine the scope of work, and plan the rewiring project.
    • Quotation and Scheduling: Provide a detailed quote and schedule for the rewiring work.
  2. Preparation
    • Clearing Work Areas: Move furniture and clear areas where work will be conducted to provide easy access to wiring routes.
    • Safety Measures: Implement safety measures, including shutting off power, to create a safe working environment.
  3. Removal of Old Wiring
    • Disconnecting: Safely disconnect and remove old wiring, sockets, switches, and other electrical components.
    • Access Creation: Create access points if required, such as lifting floorboards or chasing walls, to remove old wiring.
  4. Installation of New Wiring
    • Laying New Cables: Install new wiring according to the planned routes, ensuring compliance with safety standards and regulations.
    • Fitting Sockets and Switches: Install new sockets, switches, light fittings, and other electrical fixtures.
  5. Upgrading the Consumer Unit
    • Consumer Unit Replacement: Upgrade or replace the consumer unit (fuse box) to accommodate the new wiring and enhance safety.
  6. Testing and Certification
    • Electrical Testing: Conduct comprehensive electrical tests to ensure that all circuits and connections are safe and compliant with the IET Wiring Regulations (BS 7671).
    • Providing Certification: Issue an Electrical Installation Certificate (EIC) or an Electrical Installation Condition Report (EICR) to verify that the work meets regulatory standards.
  7. Making Good
    • Restoration: Repair any damage caused by lifting floorboards, chasing walls, or creating access points. This includes plastering, filling holes, and painting as needed.
  8. Final Checks
    • Inspection: Conduct a final inspection to ensure all work is completed to a high standard and all systems are functioning correctly.

Conclusion

The time required to rewire a house varies based on the size and complexity of the project, ranging from 3 to 5 days for small homes, 5 to 10 days for medium homes, and 10 to 20 days or more for large homes. Factors such as the age and layout of the house, scope of work, accessibility, and whether the house is occupied also influence the timeline. Proper planning, preparation, and coordination with a qualified electrician can ensure a smooth and efficient rewiring process. Understanding the steps involved and typical durations helps you plan and make informed decisions for your rewiring project.